How to order
Step 1: Consultation
1. If you have not created a schematic or the schematic needs to be updated
Our engineers can provide technical support. Learn more about our PCB design services.
2. Already have a designed Gerber file and need a quotation
For a fast and reasonable quotation, we need the following information:
GERBER file(RS-274 and RS-274X, Gerber X2)including following information
Material
Layer Counts
Solder Mask Color
SilKscreen Color
Copper Thickness
Does the via hole cover the solder mask
Surface Finishing
Quantity(Prototype,Mass Production)
For PCBA Quotation:
BOM (.xls, .xlsx)
Pick & place file (.xls, .xlsx, .txt, csv)
Step 2: Evaluation and Quotation
Our engineers provide free PCB file inspections to ensure there are no missing components or incorrect structures, and to check whether these file designs are within the capabilities of our production process.
- PCB project: Quotation within 8 hours
- PCBA project: Quotation within 12-24 hours
- Free PCB file evaluation
Step 3: PCB Prototype
Before mass production, we recommend PCB prototype manufacturing. Through this step, check whether the design of the printed circuit board is reasonable, whether the function can be used normally, and whether the quality meets the requirements of mass production.
- Can reduce production cost for customers.
- Can help customers optimize the design of the circuit board.
- It can bring technological breakthroughs to customers' innovations.
Prototype(<3m²) | Layer counts | Normal delivery | Urgent orders |
FR4 PCB | 1 layer | 5 Days | 72 hours |
2 layers | 6 Days | 4 Days | |
4 layers | 7 Days | 5 Days | |
6 layers | 7 Days | 5 Days | |
8 layers | 8 Days | 6 Days | |
10 layers | 10 Days | 8 Days |
Prototype(<3m²) | Layer counts | Normal delivery | Urgent orders |
HDI PCB | 1+ | 12-15 Days | 1 Week |
2+ | 12-15 Days | 10 Days | |
3+ | 15-20 Days | 12 Days | |
4+ | 20-25 Days | 18 Days | |
Any layer | 1 month | 20 Days |
Prototype(<3m²) | Layer counts | Normal delivery | Urgent orders |
Ceramic PCB | 1 layers | Thick Film:3 - 3.5weeks DCB/DBC/AMB: 3 - 4 weeks DPC: 2 - 3 weeks | Thick Film:1.5weeks DCB/DBC/AMB: 2 - 3 weeks DPC: 1.5 weeks |
2 layers | Thick Film:3 - 4 weeks DCB/DBC/AMB:3.5-4.5weeks DPC: 2.5 - 3.5 weeks | Thick Film:2 weeks DCB/DBC/AMB:2.5 - 3.5weeks DPC: 2 weeks | |
4 layers | Thick Film: 4 - 6 weeks | 2.5 weeks | |
6 layers | Thick Film: 4.5 - 6 weeks | 2.5 weeks | |
8 layers | Thick Film: 5 -7 weeks | 3 weeks | |
10 layers | Thick Film: 6 - 8 weeks | 3.5 - 4 weeks |
Prototype(<3m²) | Layer counts | Normal delivery | Urgent orders |
Metal core PCB | 1 layers | 1 Week | 4 Days |
2 layers | 1.5 Weeks | 7 Days | |
4 layers | 2.5 Weeks | 10 Days | |
6 layers | 3 Weeks | 12 Days | |
8 layer | 1 month | 15 Days |
Prototype(<3m²) | Layer counts | Normal delivery | Urgent orders |
Flexible PCB | 1 layers | 3-7 Days | 48 Hours |
2 layers | 3-7 Days | 48 Hours | |
3 layers | 8-12 Days | 1 Week | |
6 layers | 12-16 Days | 10 Days | |
8 layer | 18-25 Days | 15 Days |
Prototype(<3m²) | Layer counts | Normal delivery | Urgent orders |
Rigid-flex PCB | 2 layers | 8-14 Days | 1 Week |
3 layers | 14-16 Days | 8 Days | |
4 layers | 15-20 Days | 10 Days | |
6 layers | 20-25 Days | 12 Days | |
8 layer | 1 months | 15 Days |
Step 4: Printed Circuit Board Fabrication
Once the prototype is validated, we will enter the formal production phase.
We will have all the components of the Bom ready at the same time as the PCB is produced so that assembly can begin immediately after the PCB is manufactured.
All circuit boards will be 100% inspected and tested. We will provide a shipment report for your review.
- IPC-A-600F Class II. Acceptance Criteria
- IPC-TM-650 Class II. Test Method Standard
- ISO9001,ISO13485,ISO16949,AS9100C,ROHS,UL
Mass production | Layer counts | Normal delivery | Urgent orders |
FR4 PCB | 1 layer | 6 Days | 4 Days |
2 layers | 8 Days | 5 Days | |
4 layers | 10 Days | 8 Days | |
6 layers | 12 Days | 10 Days | |
8 layers | 16 Days | 12 Days | |
10 layers | 18 Days | 14 Days |
Prototype(<3m²) | Layer counts | Normal delivery | Urgent orders |
HDI PCB | 1+ | 18-22 Days | 2 weeks |
2+ | 22-28 Days | 3 weeks | |
3+ | 1 Months | 4 weeks | |
4+ | 35-40 Days | Need to evaluate | |
Any layer | 42-48 Days | Need to evaluate |
Mass production | Layer counts | Normal delivery | Urgent orders |
Ceramic PCB | 1 layers | Thick Film: 3 - 3.5weeks DCB/ DBC/ AMB: 3 - 4 weeks DPC: 2 - 3 weeks | Thick Film: 1.5weeks DCB/ DBC/ AMB: 2 - 3 weeks DPC: 1.5 weeks |
2 layers | Thick Film: 3.5- 4.5 weeks DCB/ DBC/ AMB: 4-5weeks DPC: 3 - 4 weeks | Thick Film: 2.5 weeks DCB/ DBC/ AMB:2.5 - 3.5 weeks DPC: 2 weeks | |
4 layers | Thick Film: 5.5 - 6.5 weeks | 3 weeks | |
6 layers | Thick Film: 6-7 weeks | 4 weeksp | |
8 layers | Thick Film: 7-8 weeks | 5 weeks | |
10 layers | Thick Film: 8-9 weeks | 5 weeks |
Mass production | Layer counts | Normal delivery | Urgent orders |
Metal core PCB | 1 layers | 2 Weeks | 7 Days |
2 layers | 3 Weeks | 12 Days | |
4 layers | 4 Weeks | 15Days | |
6 layers | 5 Weeks | 20 Days | |
8 layer | 1.5 month | 25 Days |
Mass production | Layer counts | Normal delivery | Urgent orders |
| 1 layers | 8-14 Days | 1 Week |
2 layers | 9-15 Days | 1 Week | |
3 layers | 14-20 Days | 1.5 Weeks | |
6 layers | 18-24 Days | 2 Weeks | |
8 layer | 20-30 Days | 4 Weeks |
Mass Production | Layer counts | Normal delivery | Urgent orders |
| 2 layers | 15-18 Days | 1.5 Weeks |
3 layers | 18-23 Days | 2Weeks | |
4 layers | 25-30 Days | 2.5Weeks | |
6 layers | 28-35 Days | 3Weeks | |
8 layer | 1.5 months | 3.5Weeks |
Step 5: PCB Assembly
We can provide you with a complete turnkey PCB assembly, working with you from the design stage to product completion, saving you time and trouble.
All components are original, no counterfeit or gray market used components are used.
The lead time for PCB assembly prototypes can be as fast as 24 hours. Mass production can also provide fast assembly process within 3-4 days.
Step 6: Inspection and Testing
PCBA inspection and testing is an important means to control product quality in the entire production process of PCBA processing. With the improvement of the pass rate of products, the pass rate of products will be greatly improved.
In our production and processing process, we have many inspection methods to ensure the production quality of SMT patch processing, DIP plug-in post-welding and other processing.
- SPI detector
- Manual visual inspection
- Digital microscope
- SMT First Article Inspection
- AOI automatic optical inspection
- X-ray
- ICT test
- FCT function test
Step 7: Package and Shipment
Package: We use vacuum packaging and outer packaging, cardboard boxes and thick cartons for all PCB products. This ensures that the packaged PCB products are not easily damaged during delivery.
Shipment: We cooperate with world famous freight forwarders: DHL, FedEx, UPS, TNT. This ensures the shortest lead times and the safe and fast arrival of the PCB at the customer's side.
Step 8: After-sale service
Every PCB made in our factory enjoys dedicated
after-sales service. If you receive the goods and cause board problems due to
our fault, you can give us after-sales feedback. The after-sales engineer will
confirm the relevant problems and contact you in time to communicate and deal
with them.